Project Summary
For a high voltage plants with large KW and KVA rated equipment’s, automation of controlling the power system via instrumentation and control devices is necessary. This can be done using data from intelligent electronic devices (IED), control and automation capabilities within the power sector, and control commands from remote users to control power-system devices.
This organization created a software from Emersion Industries just to make ease of controlling the whole power plants for their trainees. This software is then supposed to host on machines where these trainees can handle it remotely. Goal of the organization was to achieve a compatible operation to work on Azure where they can provide a solution for achieving concurrent executions and allowing their trainees to leverage on Multisession environment with additional securities.
Challenge
Leveraging a heavy application with concurrent execution was the biggest challenge as it required very high throughput and high IOPS. They needed a solution where their trainees can perform multisession seamlessly.
The owners wanted to provide remote access to their trainees for leveraging that application form remote locations and they wanted to be implemented within a secure environment. Thus, making sure the availability of application to the trainees irrespective of their location.
Solution
We did an in-depth analysis for the environment & recommended deployment of Window virtual Desktop (WVD) for their application. WVD integrated easily with the existing business environment which allowed to access the application remotely and supports concurrent access of application. Now, the users access the application via WVD over the internet and users are authenticated with their credentials and MFA (multifactor Authentication) which enhanced the security level of application at stage of authentication. WVD is very easy to Scale up and down as per business requirements.
The Simulate power software was used to provide Graphic intensive application which was required for Modelling of instruments. We integrated the WVD solution with the same for providing seamless application access to the trainees.
Connect with IFI Tech
Related Projects

Azure Devops and Automation for L&T Hydrocarbon
Project Information Country India Industry Construction & Engineering Organization Size Corporate (10000+ Employees) Solution Area DevOps Products & Services • Azure DevOps • Azure WebApps

Business Continuity for a Construction Software Company in USA
Project Information Country United State Industry Construction & Engineering Organization Size Medium (50-999 Employees) Solution Area Security & Compliance Products & Services • Azure Virtual

Vessel Fuel Monitoring Using Azure IOT Hub
Project Information Country India Industry Construction and Engineering Organization Size Large (1000 + employees) Solution Area IOT Products & Services • Azure IoT Hub• Azure
Insights

Microsoft Introduces Fabric IQ: The Intelligence Platform
Announcing Microsoft Fabric IQ: The Semantic Intelligence Platform. Microsoft Fabric IQ is the new semantic intelligence layer that elevates Fabric from a unified data platform

Microsoft Online Services Pricing Update: What It Means for You?
The ripple can be felt all across the IT sector as Microsoft introduces a change to its licensing model. The recent change has been about

Transitioning from EA to CSP with Ease
What Are The Changes Made by Microsoft in the Enterprise Agreement Criteria? Microsoft made a crucial announcement in November 2024 that many Enterprise Agreements in